Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies
Hojjat Adeli, Asim KarimHow much do you like this book?
What’s the quality of the file?
Download the book for quality assessment
What’s the quality of the downloaded files?
Presents a general methematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and and cost optimization.
Categories:
Year:
2001
Edition:
1
Publisher:
Spon Press
Language:
english
Pages:
178
ISBN 10:
0203355938
ISBN 13:
9780415244176
File:
PDF, 4.80 MB
Your tags:
IPFS:
CID , CID Blake2b
english, 2001
The file will be sent to your email address. It may take up to 1-5 minutes before you receive it.
The file will be sent to you via the Telegram messenger. It may take up to 1-5 minutes before you receive it.
Note: Make sure you have linked your account to Z-Library Telegram bot.
The file will be sent to your Kindle account. It may take up to 1–5 minutes before you receive it.
Please note: you need to verify every book you want to send to your Kindle. Check your mailbox for the verification email from Amazon Kindle.
Conversion to is in progress
Conversion to is failed
Premium benefits
- Send to eReaders
- Increased download limit
- File converter
- More search results
- More benefits